Pipeline Integration
24” Sales Gas and & 6” NGL Pipeline
- Aztec Engineering designed, procured all pipeline materials and organized construction on site
- Capable of transporting 785 MMSCFD of dehydrated natural gas
- Designed of CSA Grade 483 Cat II linepipe to reduce material costs while maintaining strength
- 8.2km in length
HDPE Fresh Water Network
- Designed to handle 20,000m3/day of fresh water with peak rates of 32,000m3/day
- Spans over 28 km
- System is fully piggable
- Modular pump packages minimize rental costs and allow greater flexibility with future frac operations